Skip to content

About Torvik · Since 2016

Sheet TV-ABT · 1 of 1

One company.Drawing todelivery.

We draw the part, test it in simulation, cut its gears, machine it and measure it against the drawing we issued. One company answers for all of it.

Design office
Peelamedu, Coimbatore, Tamil Nadu 641004, India
Manufacturing works
SIDCO Industrial Estate, Kurichi, Coimbatore 641021, India

Our story

The waste sits between the drawing and the part

Design office

Design

  • Concept engineering
  • 3D modelling
  • Simulation
  • Drawings

Peelamedu, Coimbatore, Tamil Nadu 641004, India

Manufacturing works

Manufacture

  • Gear cutting
  • Machining
  • Inspection
  • Dispatch

SIDCO Industrial Estate, Kurichi, Coimbatore 641021, India

Drawing offices rarely run a machine.Machine shops rarely wrote the drawing.

Torvik started in 2016 because we kept seeing good designs lose time and money in the hand-over from the drawing office to the shop.

We put both sides in one company. Concept work, CAD, simulation and drawings run alongside gear cutting, machining and inspection, all working from the same drawing set.

Whoever writes a tolerance knows the machine that must hold it, so a part is makeable before it is released. If a part fails, one team owns the fix, and nobody spends a week deciding whose drawing was wrong.

Our commitments

Two suppliers, or one

“Draw nothing you would not want to make yourself.”

The rule Torvik started with
  1. 01Manufacturability

    Bought separately: Problems surface at the first article, long after the design is signed off.

    With Torvik: Checked at the design stage with the machinists who will cut it.

  2. 02Tolerance queries

    Bought separately: Each supplier blames the other, and the job waits.

    With Torvik: One reply, from the team that both drew and made the part.

  3. 03Price

    Bought separately: Pay for the design, then go looking for a shop.

    With Torvik: A single quote for design and making, or for either one.

  4. 04A failed first article

    Bought separately: Two contracts, and no one clearly at fault.

    With Torvik: A named owner answers for it, start to finish.

  5. 05Design changes

    Bought separately: New drawing, new quote, new negotiation.

    With Torvik: Checked against what our machines can hold, and in production that week.

  6. 06Tooling

    Bought separately: The shop keeps it, so changing supplier costs money.

    With Torvik: We make our own tooling, and the drawing pack stays yours.

  7. 07Low volumes and legacy parts

    Bought separately: Turned away, or quoted at a premium.

    With Torvik: Worth doing, since we make the patterns and tooling ourselves.

  8. 08Proof of design

    Bought separately: Analysis costs extra, when it happens at all.

    With Torvik: FEA, CFD and fatigue checks done in-house by PhD engineers.

  9. 09Quality evidence

    Bought separately: Depends on the supplier, and on the order.

    With Torvik: ISO 9001-style processes, with an inspection report and material certificate in every batch.

  10. 10Payment

    Bought separately: Overseas suppliers often want money upfront.

    With Torvik: Open account terms with 30 days' export credit.

2016 to 2030

Ten years behind us, 2030 ahead

  1. 2016

    Founded

    Drawing office and works together

    Started as one company with a design office and a manufacturing works, so the people who draw parts and the people who make them answer to the same team.

  2. Today

    Ten years on

    A record in service

    More than 60 design programmes, 350 manufacturing projects for OEMs and 85,000 parts shipped, most of them to Germany and the UK, each batch with its inspection report and material certificate.

  3. 2030

    The plan

    The first call for design and make

    The partner packaging, material-handling, off-highway and agricultural machine builders call first, with long-running export work in Germany, the UK and the USA.

People

The people behind the part

Designers and machinists in the same company, with one person answering for each programme.

  • Technical leadership

    Senior engineers who have spent their careers on gearboxes and product design. They set the technical direction for both the drawing office and the works, and write the manufacturability checks every programme must pass.

  • Simulation bench

    FEA and CFD run by PhD engineers who have worked in industry. Strength, heat, flow and fatigue are answered before any metal is cut.

  • Gear manufacturing

    Machinists with years on hobbing and grinding machines, cutting gears to drawings issued by our own design office.

  • Named engineers

    Each programme has engineers you know by name from enquiry to delivery, and one person accountable for the result.

Our mission

Make our customers' products cheaper to build and quicker to market by settling cost and manufacturability while the part is still a drawing.

How we work

  1. A partner, not a supplier

    We want to be the people you hand an idea to, not the ones you send a purchase order.

  2. Part of your team

    Working to your standards and during your working day, as if we sat in your office.

  3. Integrity

    We ask instead of guessing, warn you early about delays, and the drawing pack always stays yours.

  4. Continuous learning

    Engineers stay for hard problems and real responsibility, and we keep giving them both.

3D render of a steel worm and bronze-style worm wheel in mesh.
Fig. 1Helical pair, splined shafts

Why Torvik

Design + make, in one company.

  • Design to manufacture

    Concept, drawings and production in one company, not three.

  • Engineering that builds

    Cost, quality and makeability settled in the design.

  • Multidisciplinary expertise

    Design, simulation, machining and sourcing in the same building.

  • International standards

    Drawings read and written to BS, ASME and ISO.

  • Hands-on engineering

    Senior engineers stay with a part from sketch to machine.

  • Faster to market

    Fewer hand-overs, faster answers, earlier production.

Tooling

Made in-house

We make our own casting patterns, fixtures, locators, cutting tools and gauges. That is why short runs and obsolete parts make sense here when bigger suppliers say no. Send a drawing, a sample or a worn part and we can start from it.

  • Casting patterns
  • Fixtures & locators
  • Cutting tools
  • Gauges
Render of a stepped shaft with a splined end.
Fig. 2Stepped splined shaft

How to engage

Three ways to hire us

  1. Full product lifecycle

    From concept through CAD and prototype to a design pack ready for production, checked and signed off.

  2. Dedicated engineers

    Engineers assigned to your team for an agreed period, at a monthly cost you can plan around.

  3. On demand

    Extra hands at short notice for drawings, analysis runs and detailing, without adding headcount.

Commercial termsFixed scopeTime & materialsDedicated capacityOpen account, 30 days' export creditNDA on request

Markets

Where the parts go

85,000+ parts shipped so far, most of them to Germany and the UK, with customers as far off as the UAE, South Africa and Australia.

  • GermanyMain export market
  • United KingdomMain export market
  • United States
  • United Arab Emirates
  • South Africa
  • Australia
  • India
  • Packaging machinery
  • Material handling
  • Agricultural equipment
  • Machine tools
  • Renewables
  • Mining
  • Off-highway
  • Rail
  • Process plant

Torvik Engineering Pvt. Ltd.

Founded 2016