SVC-08 / 08Duty-cycle and qualification tests
Validation & Testing
Physical tests to international standards
Physical tests that show a part meets the duty cycle and the environment written into its requirements.

Why it works here
Calculated first, then run on a rig
If no standard bench can reproduce the duty, we design and build an automated rig and run the prototype for real hours.
Our engineers sit next to our own CNC machines, gear cutters and assembly benches, so every analysis is checked against what the works can actually make.
Where it is applied
Sectors
- A
Valve actuation & flow systems
High-torque cycling, seat leak tests and burst tests.
- B
Industrial gearboxes
Full-load heat runs, backlash measurement and vibration spectra.
- C
Subsea & harsh environment
IP rating, salt spray exposure and high-pressure tests.
What you receive
| Item | Deliverable |
|---|---|
| 01 | Hydrostatic and pneumatic pressure tests |
| 02 | Endurance and fatigue cycling |
| 03 | Load and deflection tests |
| 04 | Thermal and environmental test logs |
| 05 | A compliance report pack |
Tools & standards
- Tests
- Pressure, endurance, load, environmental
- Rigs
- Purpose-built automated rigs where needed
- Hands over
- Compliance report pack
- New parts
- First article report, AS9102 format
- Design practice
- ASME / ISO DFM
- Every batch
- EN 10204 · type 3.1
Where it sits in a programme
Validation & Testing works at the Prototype stage of the five that every programme runs through, from concept to manufacture.
- P-01ConceptFeasibility, system architecture, ideation
- P-02Design3D parametric CAD, DFM reviews, detailing
- P-03AnalysisFEA structural, CFD fluid flow, thermal
- P-04This servicePrototypeRapid 3D print, CNC first-offs, validation
- P-05ManufacturePrecision machining, GD&T, volume supply

