Skip to content

Quality · AS9102 · EN 10204 3.1

Checked onevery batch

Every batch follows ISO 9001-style processes: checks at the machine and at the end, SPC, NCR and CAPA closed on paper, and an inspection report and material certificate packed with the parts.

Documentation

Paperwork with the parts

Every batch ships with two documents. Open one to read a full sample.

First article report

AS9102 format · every new part

Format
AS9102 forms 1 to 3
Covers
Every ballooned characteristic on the drawing
Measured on
Temperature-controlled CMM and gear analyser
When
Before a new part goes to batch

Material certificate

EN 10204 · type 3.1

Standard
EN 10204, type 3.1
Records
Chemistry, hardness, tensile strength, ultrasonic test
Traceable to
The heat number and the batch inspection report

Document

The inspection path

Five gates before the crate

Each batch follows one route from the machine to dispatch, and no gate is ever skipped.

  1. IN-PROC

    Step 1: In-process inspection

    Measured at the machine during the run, not just once it is finished.

  2. FINAL

    Step 2: Final inspection

    Checked against the drawing on a temperature-controlled CMM before it leaves.

  3. SPC

    Step 3: Statistical process control

    We track the process, not only the parts, and catch drift before it makes scrap.

  4. NCR / CAPA

    Step 4: NCR and CAPA closure

    Every non-conformance is logged, its root cause fixed and stopped from returning, and the close-out filed.

  5. DISPATCH

    Step 5: Report and material certificate

    The inspection report and material certificate travel in the box with each batch.

Standards

Made the way you drew it

  • BSBritish Standard drawing practice
  • ASMEY14.5 dimensions and tolerances
  • ISOISO 1101 geometric tolerances
3D render of a webbed steel spur gear with five lightening holes.
Gear qualityISO 1328 · grade 5 to 9

The gear quality we cut to, with ground gearing where the duty needs it, and every gearbox run-in and checked before dispatch.

  • GD&T read the way your engineers meant it
  • A question when a drawing is unclear, never an assumption
  • Written English from engineers used to working with customers
  • Progress tracked against the plan, with delays reported early
Registered as
Torvik Engineering Pvt. Ltd.
Send us a drawing