First article report
AS9102 format · every new part
- Format
- AS9102 forms 1 to 3
- Covers
- Every ballooned characteristic on the drawing
- Measured on
- Temperature-controlled CMM and gear analyser
- When
- Before a new part goes to batch
Quality · AS9102 · EN 10204 3.1
Every batch follows ISO 9001-style processes: checks at the machine and at the end, SPC, NCR and CAPA closed on paper, and an inspection report and material certificate packed with the parts.
Documentation
Every batch ships with two documents. Open one to read a full sample.
AS9102 format · every new part
EN 10204 · type 3.1
The inspection path
Each batch follows one route from the machine to dispatch, and no gate is ever skipped.
Measured at the machine during the run, not just once it is finished.
Checked against the drawing on a temperature-controlled CMM before it leaves.
We track the process, not only the parts, and catch drift before it makes scrap.
Every non-conformance is logged, its root cause fixed and stopped from returning, and the close-out filed.
The inspection report and material certificate travel in the box with each batch.
Standards

The gear quality we cut to, with ground gearing where the duty needs it, and every gearbox run-in and checked before dispatch.